May 21, 2008 6:28 pm US/Central
Firm's Bridge Collapse Report Critical Of MnDOT
ST. PAUL (AP) ―
Transportation officials called the Minneapolis bridge a "budget buster," so expensive to fix or replace that decisions were put off, for years, until it collapsed last August.
A
new report on Wednesday said money worries, imprecise inspections, and disregard of policies at the Minnesota Department of Transportation may have led to bad maintenance decisions ahead of the catastrophe that killed 13 people.
A separate federal investigation has highlighted a design flaw and the weight of construction materials as critical factors, rather than maintenance. But the report, done by a law firm hired by the Legislature, examined MnDOT's structure and procedures and found that warning signs about problems with the bridge were not acted upon.
"Financial considerations, we believe, did play a part in the decision-making" regarding fixing the bridge, said Robert Stein, who oversaw the report by the Gray Plant Mooty law firm.
"Sometimes it's easier just to take the least expensive alternative or just commission another study," Stein told lawmakers on Wednesday.
For example, instead of a $40,000 ground-penetrating radar survey of the bridge deck in 2006, engineers dragged a chain across the span to listen for unsound concrete. The radar test, an internal e-mail notes, "was not completed due to lack of funding."
That same year, officials from the state's bridge division examined rehabilitation and reconstruction options. In meeting minutes, they noted that a replacement bridge would cost $75 million or more, a project they concluded would be "cost prohibitive" and not in the cards for 20 years. The new bridge expected to be done by this fall will cost at least $230 million.
One lawmaker wanted to know whose job it was at MnDOT to ask for the money for repair or replacement.
"There was confusion about where the money would come from once you got to anything major," answered Tom Johnson, another attorney for the firm.
The bridge was rated in "serious to poor" condition for 17 consecutive years by the National Bridge Inventory Standards.
The report said MnDOT guidelines called for the rust to be scraped off bridge trusses so the good steel could be measured precisely. But after 1993 precise measurements weren't included in yearly bridge reports. That meant that in 1998, transportation officials re-calculating the bridge's weight capacity had to use the original design measurements rather than the amount of good steel that was really on the bridge, the report said.
Two MnDOT inspectors who wrote inspection reports said they'd never even seen a written copy of those guidelines about measuring the remaining metal. And supervisors who should have made sure the reports were complete did not, the report said.
Stacked up, the report and its appendices stood 15 inches tall and lawmakers went through it with pencils and highlighters at the ready at the three-hour hearing. Sen. Steve Murphy, DFL-Red Wing, instructed questioners to raise their hands high. "I can't see anybody over the stacks of paper," he said.
MnDOT Commissioner Tom Sorel, who took his post only last month after previous leader Carol Molnau was ousted, said he was reviewing the report and couldn't comment in detail on many of its findings.
"Addressing the condition and safety needs of our bridge system has never been and never will be subject to question due to budgetary concern," Sorel said. "We rely on and invest in the expert opinions and recommendations of our bridge engineering professionals."
Republican Gov. Tim Pawlenty has asked Sorel to determine if the report should lead to organizational changes. But Pawlenty spokesman Brian McClung said, "Until the cause of the collapse is determined, it is not possible to know whether anything in this report is relevant to the bridge collapse."
The National Transportation Safety Board investigation of the bridge's structural problems is expected to be finished later this year. The design flaw pinpointed by the NTSB involved some gusset plates, which help connect steel trusses, that were too thin.
The interviews conducted by the law firm included four with engineers at URS Corp., the consulting firm hired in 2003 to study the bridge and determine if upgrades were needed. URS has declined requests for media interviews.
Edward Zhou, one of the engineers, was asked about a September 2005 memo in which he wrote briefly about what would happen if a gusset plate buckled. He said in the handwritten memo it wouldn't be catastrophic. In the recorded interview, Zhou downplayed the exchange.
"We determined that it's not necessary for us to get into the level of details of reexamining the gusset plate if they were designed properly," he said. "One of the basic design principles is that the connections are to be designed no weaker than the members. So we check the members. We also check the connections, but the connections were assumed to be as strong as they were designed probably."
(© 2008 The Associated Press. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.)